Anheuser-Busch InBev (Becks Bremen) – From A to Z

Planning for moving the supply station for the internal cleaning of kegs to KG building 206
Various installations in brewhouses 1, 2 and 3
Planning, delivery and assembly of service water pipe from building 508 KG to building 206 KG
System 1 CIP plant, replace PVC hoses for stainless steel pipes
Fitment of flow rate metering equipment
Distribution line LK 6 for EA plant
Firefighting pipes
Replacement of compressed air manifold DN 200 MH 2

 

Vilsa-Brunnen – Pipes and connections

Sterile steam pipe from syrup room to plant 1.3
Cold water pipes system 6+7
Deionized water pipe, laboratory
Conversion of steam and condensate connections
A range of piecework

 

A particular challenge:

Pipeline systems in the food and drinks industry must satisfy high quality and hygiene requirements. With our expertise, we are able to deal with this specific requirement; from the choice of materials, via production of the pipelines to assembly and commissioning. Both for new builds and conversions as well as for repair and servicing work.